<legend id="9yyzq"></legend>
<tbody id="9yyzq"></tbody>

    <em id="9yyzq"><acronym id="9yyzq"><input id="9yyzq"></input></acronym></em>

  1.  
         
         
         
         
         
         
         
         
         
         
         
         
     
    Products
    Contact us
    Ming Fat Building Materials Group Co., Ltd. Nanjing
    TEL: (025) 58259528 FAX: (025) 58259335
    www.sb1562.com
    Nanjing Pukou District Pearl River Industrial Park (Wei 3 Road)
    Zip Code: 211800
     
    Products >> Putty powder
    Wall putty powder MP 71

    Features:
    1, strong adhesive, water resistance and weather are excellent. Can be firmly bonded in a variety of base surfaces;
    2, with good flexibility, anti-cracking performance;
    3, construction of simple smooth, simple smoothing that can be smooth and delicate surface, reducing the amount of decorative coatings;
    4, good ventilation, no volatiles and odor, is a green product.
    Scope: This product is suitable for cement mortar base surface, concrete surface, and various light leveling plaster board processing, also applies to tile Masaikeji face, without elimination of the old wall renovation.
    Standard: Product quality in line with current national standards: JG / T 157 - 2004
    Treating surface: base surface must be clean, smooth, firm, no grease, release agents, loose goods.
    Construction Description:
    1, first the right amount of fresh water into the container, and then slowly adding MP71 putty powder, using an electric mixer (power 750W, speed 500r / m) and stir the glue evenly without dough, 3 to 5 minutes and then placed Stir once.
    2, the proposed ratio: powder: water = 1:0.33 ~ 0.36
    3, glue evenly with a spatula to scrape put on base surface, usually 2 to 3 times scrape, scrape a single batch of 1.0mm thickness should be controlled in less than 4 hours after the first Guawan be awarded for the first 2 scratch.
    4, wall putty, after the completion of 24 hours, depending on temperature and humidity conditions, water conservation 2 to 3 days, putty for better performance of the play effect.
    Note:
    1, mixing putty should be used within 3 hours, should not have to have the cream mixture to dry and then mixed with water.
    2, suitable for construction of temperature 5 ~ 35 ℃, before construction if the wall is too dry or too fast absorbent, should dampen the surface water subject to ignorance.
    3, domestic demand, at least 12 hours after construction to prevent rain.
    Packing: 25 kg / bag
    Normal dosage: 1.2 ~ 2.0 kg / m (depending on construction requirements and the base amount of surface roughness may be).
    Shelf life: Store in a cool dry place, not unsealed products can be stored for 6 months.

    Indoor putty powder MP 72

    Features:
    1, strong adhesive, excellent water resistance and weather resistance. Can be firmly bonded in a variety of base surfaces;
    2, with good flexibility, anti-cracking performance;
    3, construction of simple smooth, simple smoothing that can be smooth and delicate surface, reducing the amount of decorative coatings;
    4, good ventilation, no volatiles and odor, is a green product.
    Scope: This product is suitable for all kinds of interior wall paint special high bottom ash, but also to cement mortar base surface, concrete surface and surface rendering of various light leveling plate handling, to provide a good surface coating smooth construction base level.
    Standard: Product quality in line with current national standards: JG / T 3049 - 1998
    Treating surface: base surface must be clean, smooth, firm, no grease, release agents, loose goods.
    Construction Description:
    1, first the right amount of fresh water into the container, and then slowly adding MP72 putty powder, using an electric mixer (power 750W, speed 500r / m) and stir the glue evenly without dough, place 3 to 5 minutes to Stir once.
    2, the proposed ratio: powder: water = 1:0.35 ~ 0.40
    3, glue evenly with a spatula to scrape put on base surface, usually 2 to 3 times scrape, scrape a single batch of 1.0mm thickness should be controlled in less than 4 hours after the first Guawan be awarded for the first 2 scratch.
    4, depending on weather conditions, can be polished in 1 to 2 days, just grinding knife marks Office, Do not over-polished so as not to affect the strength.
    Note:
    1, suitable for construction of temperature 5 ~ 35 ℃
    2, mixed putty should be used within 3 hours, should not have to have the cream mixture to dry and then mixed with water.
    3, heart plaster surface should be about 12 days before granting the conservation embedded putty, do not use cement paste calendar.
    Copyright:Ming Fa Building Materials Group Co., Ltd. Nanjing
    Total Visits:
    91精品国产一区自在线拍-91国语精品自产拍在线观看性色-91国内揄拍国内精品对白不卡